{"id":32069,"date":"2019-11-08T12:53:51","date_gmt":"2019-11-08T12:53:51","guid":{"rendered":"http:\/\/thevoiceoflondon.co.uk\/?p=32069"},"modified":"2019-11-08T12:53:51","modified_gmt":"2019-11-08T12:53:51","slug":"crossrail-delayed-another-year","status":"publish","type":"post","link":"https:\/\/blog.westminster.ac.uk\/thevoiceoflondon\/crossrail-delayed-another-year\/","title":{"rendered":"Crossrail delayed until 2021"},"content":{"rendered":"<p>Crossrail, expected to be called the Elizabeth line, won\u2019t operate until 2021.<\/p>\n<p>Mark Wild, chief executive of Crossrail Ltd, released a statement on Friday the line will run once \u201cpractically possible in 2021\u201d and additional funding of up to \u00a3650m, taking the total of the project over \u00a318bn.<\/p>\n<p>The highly anticipated service was scheduled to open in December 2018 but has faced perpetual setbacks.<\/p>\n<p>Crossrail is to stretch over 60 miles \u2013 running east-west of London, as far as Reading to Shenfield \u2013 and designed to ease traffic on the Jubilee line at Canada Water and Canary Wharf.<\/p>\n<p>The statement, that was released Friday, said:<\/p>\n<p>&#8220;Our detailed cost forecasts continue to show that the project\u2019s costs will increase due to programme risks and uncertainties. The latest projections indicate a range of between \u00a3400 million to \u00a3650 million more than the revised funding&#8221;, agreed by the Mayor, Government and Transport for London in December 2018.<\/p>\n<p>\u201cWe are doing everything we can to complete the Elizabeth line as quickly as we can but there are no short-cuts to delivering this hugely complex railway. The Elizabeth line must be completed to the highest safety and quality standards.\u201d<\/p>\n<p>The delay is down to safety assessments and signal software, but the statement is unclear if further delays are expected, mentioning that Londoners will be informed with further clarity \u201cabout when the Elizabeth line will open early in 2020.\u201d<\/p>\n<p>Words: Dan Branston<\/p>\n<p>Photo:\u00a0Crossrail Ltd<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Crossrail, expected to be called the Elizabeth line, won\u2019t operate until 2021. Mark Wild, chief executive of Crossrail Ltd, released a statement on Friday the line will run once \u201cpractically possible in 2021\u201d and additional&#8230;<\/p>\n","protected":false},"author":476,"featured_media":32082,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[93,135],"tags":[],"class_list":["post-32069","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-uncategorized"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 4.9.8 - aioseo.com -->\n\t<meta name=\"description\" content=\"Crossrail, expected to be called the Elizabeth line, won\u2019t operate until 2021. Mark Wild, chief executive of Crossrail Ltd, released a statement on Friday the line will run once \u201cpractically possible in 2021\u201d and additional funding of up to \u00a3650m, taking the total of the project over \u00a318bn. The highly anticipated service was scheduled to\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Voice of London\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/blog.westminster.ac.uk\/thevoiceoflondon\/crossrail-delayed-another-year\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 4.9.8\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_GB\" \/>\n\t\t<meta property=\"og:site_name\" content=\"Voice of London - News for young Londoners\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Crossrail delayed until 2021 - Voice of London\" \/>\n\t\t<meta property=\"og:description\" content=\"Crossrail, expected to be called the Elizabeth line, won\u2019t operate until 2021. Mark Wild, chief executive of Crossrail Ltd, released a statement on Friday the line will run once \u201cpractically possible in 2021\u201d and additional funding of up to \u00a3650m, taking the total of the project over \u00a318bn. The highly anticipated service was scheduled to\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/blog.westminster.ac.uk\/thevoiceoflondon\/crossrail-delayed-another-year\/\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2019-11-08T12:53:51+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2019-11-08T12:53:51+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Crossrail delayed until 2021 - Voice of London\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Crossrail, expected to be called the Elizabeth line, won\u2019t operate until 2021. Mark Wild, chief executive of Crossrail Ltd, released a statement on Friday the line will run once \u201cpractically possible in 2021\u201d and additional funding of up to \u00a3650m, taking the total of the project over \u00a318bn. The highly anticipated service was scheduled to\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/blog.westminster.ac.uk\\\/thevoiceoflondon\\\/crossrail-delayed-another-year\\\/#blogposting\",\"name\":\"Crossrail delayed until 2021 - Voice of London\",\"headline\":\"Crossrail delayed until 2021\",\"author\":{\"@id\":\"https:\\\/\\\/blog.westminster.ac.uk\\\/thevoiceoflondon\\\/author\\\/editor1\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/blog.westminster.ac.uk\\\/thevoiceoflondon\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/blog.westminster.ac.uk\\\/thevoiceoflondon\\\/wp-content\\\/uploads\\\/sites\\\/64\\\/2019\\\/11\\\/elizabeth_line_test_train_exiting_victoria_dock_portal_303064-1.jpg\",\"width\":770,\"height\":432,\"caption\":\"Credits to Crossrail Ltd\"},\"datePublished\":\"2019-11-08T12:53:51+00:00\",\"dateModified\":\"2019-11-08T12:53:51+00:00\",\"inLanguage\":\"en-GB\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/blog.westminster.ac.uk\\\/thevoiceoflondon\\\/crossrail-delayed-another-year\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/blog.westminster.ac.uk\\\/thevoiceoflondon\\\/crossrail-delayed-another-year\\\/#webpage\"},\"articleSection\":\"News, Uncategorized\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/blog.westminster.ac.uk\\\/thevoiceoflondon\\\/crossrail-delayed-another-year\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/blog.westminster.ac.uk\\\/thevoiceoflondon#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/blog.westminster.ac.uk\\\/thevoiceoflondon\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/blog.westminster.ac.uk\\\/thevoiceoflondon\\\/category\\\/news\\\/#listItem\",\"name\":\"News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/blog.westminster.ac.uk\\\/thevoiceoflondon\\\/category\\\/news\\\/#listItem\",\"position\":2,\"name\":\"News\",\"item\":\"https:\\\/\\\/blog.westminster.ac.uk\\\/thevoiceoflondon\\\/category\\\/news\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/blog.westminster.ac.uk\\\/thevoiceoflondon\\\/crossrail-delayed-another-year\\\/#listItem\",\"name\":\"Crossrail delayed until 2021\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/blog.westminster.ac.uk\\\/thevoiceoflondon#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/blog.westminster.ac.uk\\\/thevoiceoflondon\\\/crossrail-delayed-another-year\\\/#listItem\",\"position\":3,\"name\":\"Crossrail delayed until 2021\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/blog.westminster.ac.uk\\\/thevoiceoflondon\\\/category\\\/news\\\/#listItem\",\"name\":\"News\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/blog.westminster.ac.uk\\\/thevoiceoflondon\\\/#organization\",\"name\":\"Voice of London\",\"description\":\"News for young Londoners\",\"url\":\"https:\\\/\\\/blog.westminster.ac.uk\\\/thevoiceoflondon\\\/\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/blog.westminster.ac.uk\\\/thevoiceoflondon\\\/author\\\/editor1\\\/#author\",\"url\":\"https:\\\/\\\/blog.westminster.ac.uk\\\/thevoiceoflondon\\\/author\\\/editor1\\\/\",\"name\":\"Voice of London\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/blog.westminster.ac.uk\\\/thevoiceoflondon\\\/crossrail-delayed-another-year\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/7b0504af0db5fce5a2f16c0c09907898f0a04c320fff93b4663da62ef812790a?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Voice of London\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/blog.westminster.ac.uk\\\/thevoiceoflondon\\\/crossrail-delayed-another-year\\\/#webpage\",\"url\":\"https:\\\/\\\/blog.westminster.ac.uk\\\/thevoiceoflondon\\\/crossrail-delayed-another-year\\\/\",\"name\":\"Crossrail delayed until 2021 - Voice of London\",\"description\":\"Crossrail, expected to be called the Elizabeth line, won\\u2019t operate until 2021. Mark Wild, chief executive of Crossrail Ltd, released a statement on Friday the line will run once \\u201cpractically possible in 2021\\u201d and additional funding of up to \\u00a3650m, taking the total of the project over \\u00a318bn. The highly anticipated service was scheduled to\",\"inLanguage\":\"en-GB\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/blog.westminster.ac.uk\\\/thevoiceoflondon\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/blog.westminster.ac.uk\\\/thevoiceoflondon\\\/crossrail-delayed-another-year\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/blog.westminster.ac.uk\\\/thevoiceoflondon\\\/author\\\/editor1\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/blog.westminster.ac.uk\\\/thevoiceoflondon\\\/author\\\/editor1\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/blog.westminster.ac.uk\\\/thevoiceoflondon\\\/wp-content\\\/uploads\\\/sites\\\/64\\\/2019\\\/11\\\/elizabeth_line_test_train_exiting_victoria_dock_portal_303064-1.jpg\",\"@id\":\"https:\\\/\\\/blog.westminster.ac.uk\\\/thevoiceoflondon\\\/crossrail-delayed-another-year\\\/#mainImage\",\"width\":770,\"height\":432,\"caption\":\"Credits to Crossrail Ltd\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/blog.westminster.ac.uk\\\/thevoiceoflondon\\\/crossrail-delayed-another-year\\\/#mainImage\"},\"datePublished\":\"2019-11-08T12:53:51+00:00\",\"dateModified\":\"2019-11-08T12:53:51+00:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/blog.westminster.ac.uk\\\/thevoiceoflondon\\\/#website\",\"url\":\"https:\\\/\\\/blog.westminster.ac.uk\\\/thevoiceoflondon\\\/\",\"name\":\"Voice of London\",\"description\":\"News for young Londoners\",\"inLanguage\":\"en-GB\",\"publisher\":{\"@id\":\"https:\\\/\\\/blog.westminster.ac.uk\\\/thevoiceoflondon\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Crossrail delayed until 2021 - Voice of London","description":"Crossrail, expected to be called the Elizabeth line, won\u2019t operate until 2021. Mark Wild, chief executive of Crossrail Ltd, released a statement on Friday the line will run once \u201cpractically possible in 2021\u201d and additional funding of up to \u00a3650m, taking the total of the project over \u00a318bn. The highly anticipated service was scheduled to","canonical_url":"https:\/\/blog.westminster.ac.uk\/thevoiceoflondon\/crossrail-delayed-another-year\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/blog.westminster.ac.uk\/thevoiceoflondon\/crossrail-delayed-another-year\/#blogposting","name":"Crossrail delayed until 2021 - Voice of London","headline":"Crossrail delayed until 2021","author":{"@id":"https:\/\/blog.westminster.ac.uk\/thevoiceoflondon\/author\/editor1\/#author"},"publisher":{"@id":"https:\/\/blog.westminster.ac.uk\/thevoiceoflondon\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/blog.westminster.ac.uk\/thevoiceoflondon\/wp-content\/uploads\/sites\/64\/2019\/11\/elizabeth_line_test_train_exiting_victoria_dock_portal_303064-1.jpg","width":770,"height":432,"caption":"Credits to Crossrail Ltd"},"datePublished":"2019-11-08T12:53:51+00:00","dateModified":"2019-11-08T12:53:51+00:00","inLanguage":"en-GB","mainEntityOfPage":{"@id":"https:\/\/blog.westminster.ac.uk\/thevoiceoflondon\/crossrail-delayed-another-year\/#webpage"},"isPartOf":{"@id":"https:\/\/blog.westminster.ac.uk\/thevoiceoflondon\/crossrail-delayed-another-year\/#webpage"},"articleSection":"News, Uncategorized"},{"@type":"BreadcrumbList","@id":"https:\/\/blog.westminster.ac.uk\/thevoiceoflondon\/crossrail-delayed-another-year\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/blog.westminster.ac.uk\/thevoiceoflondon#listItem","position":1,"name":"Home","item":"https:\/\/blog.westminster.ac.uk\/thevoiceoflondon","nextItem":{"@type":"ListItem","@id":"https:\/\/blog.westminster.ac.uk\/thevoiceoflondon\/category\/news\/#listItem","name":"News"}},{"@type":"ListItem","@id":"https:\/\/blog.westminster.ac.uk\/thevoiceoflondon\/category\/news\/#listItem","position":2,"name":"News","item":"https:\/\/blog.westminster.ac.uk\/thevoiceoflondon\/category\/news\/","nextItem":{"@type":"ListItem","@id":"https:\/\/blog.westminster.ac.uk\/thevoiceoflondon\/crossrail-delayed-another-year\/#listItem","name":"Crossrail delayed until 2021"},"previousItem":{"@type":"ListItem","@id":"https:\/\/blog.westminster.ac.uk\/thevoiceoflondon#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/blog.westminster.ac.uk\/thevoiceoflondon\/crossrail-delayed-another-year\/#listItem","position":3,"name":"Crossrail delayed until 2021","previousItem":{"@type":"ListItem","@id":"https:\/\/blog.westminster.ac.uk\/thevoiceoflondon\/category\/news\/#listItem","name":"News"}}]},{"@type":"Organization","@id":"https:\/\/blog.westminster.ac.uk\/thevoiceoflondon\/#organization","name":"Voice of London","description":"News for young Londoners","url":"https:\/\/blog.westminster.ac.uk\/thevoiceoflondon\/"},{"@type":"Person","@id":"https:\/\/blog.westminster.ac.uk\/thevoiceoflondon\/author\/editor1\/#author","url":"https:\/\/blog.westminster.ac.uk\/thevoiceoflondon\/author\/editor1\/","name":"Voice of London","image":{"@type":"ImageObject","@id":"https:\/\/blog.westminster.ac.uk\/thevoiceoflondon\/crossrail-delayed-another-year\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/7b0504af0db5fce5a2f16c0c09907898f0a04c320fff93b4663da62ef812790a?s=96&d=mm&r=g","width":96,"height":96,"caption":"Voice of London"}},{"@type":"WebPage","@id":"https:\/\/blog.westminster.ac.uk\/thevoiceoflondon\/crossrail-delayed-another-year\/#webpage","url":"https:\/\/blog.westminster.ac.uk\/thevoiceoflondon\/crossrail-delayed-another-year\/","name":"Crossrail delayed until 2021 - Voice of London","description":"Crossrail, expected to be called the Elizabeth line, won\u2019t operate until 2021. Mark Wild, chief executive of Crossrail Ltd, released a statement on Friday the line will run once \u201cpractically possible in 2021\u201d and additional funding of up to \u00a3650m, taking the total of the project over \u00a318bn. The highly anticipated service was scheduled to","inLanguage":"en-GB","isPartOf":{"@id":"https:\/\/blog.westminster.ac.uk\/thevoiceoflondon\/#website"},"breadcrumb":{"@id":"https:\/\/blog.westminster.ac.uk\/thevoiceoflondon\/crossrail-delayed-another-year\/#breadcrumblist"},"author":{"@id":"https:\/\/blog.westminster.ac.uk\/thevoiceoflondon\/author\/editor1\/#author"},"creator":{"@id":"https:\/\/blog.westminster.ac.uk\/thevoiceoflondon\/author\/editor1\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/blog.westminster.ac.uk\/thevoiceoflondon\/wp-content\/uploads\/sites\/64\/2019\/11\/elizabeth_line_test_train_exiting_victoria_dock_portal_303064-1.jpg","@id":"https:\/\/blog.westminster.ac.uk\/thevoiceoflondon\/crossrail-delayed-another-year\/#mainImage","width":770,"height":432,"caption":"Credits to Crossrail Ltd"},"primaryImageOfPage":{"@id":"https:\/\/blog.westminster.ac.uk\/thevoiceoflondon\/crossrail-delayed-another-year\/#mainImage"},"datePublished":"2019-11-08T12:53:51+00:00","dateModified":"2019-11-08T12:53:51+00:00"},{"@type":"WebSite","@id":"https:\/\/blog.westminster.ac.uk\/thevoiceoflondon\/#website","url":"https:\/\/blog.westminster.ac.uk\/thevoiceoflondon\/","name":"Voice of London","description":"News for young Londoners","inLanguage":"en-GB","publisher":{"@id":"https:\/\/blog.westminster.ac.uk\/thevoiceoflondon\/#organization"}}]},"og:locale":"en_GB","og:site_name":"Voice of London - News for young Londoners","og:type":"article","og:title":"Crossrail delayed until 2021 - Voice of London","og:description":"Crossrail, expected to be called the Elizabeth line, won\u2019t operate until 2021. Mark Wild, chief executive of Crossrail Ltd, released a statement on Friday the line will run once \u201cpractically possible in 2021\u201d and additional funding of up to \u00a3650m, taking the total of the project over \u00a318bn. The highly anticipated service was scheduled to","og:url":"https:\/\/blog.westminster.ac.uk\/thevoiceoflondon\/crossrail-delayed-another-year\/","article:published_time":"2019-11-08T12:53:51+00:00","article:modified_time":"2019-11-08T12:53:51+00:00","twitter:card":"summary_large_image","twitter:title":"Crossrail delayed until 2021 - Voice of London","twitter:description":"Crossrail, expected to be called the Elizabeth line, won\u2019t operate until 2021. Mark Wild, chief executive of Crossrail Ltd, released a statement on Friday the line will run once \u201cpractically possible in 2021\u201d and additional funding of up to \u00a3650m, taking the total of the project over \u00a318bn. The highly anticipated service was scheduled to"},"aioseo_meta_data":{"post_id":"32069","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":null,"schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":null,"created":"2021-10-11 09:17:35","updated":"2025-07-10 11:50:48","seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/blog.westminster.ac.uk\/thevoiceoflondon\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/blog.westminster.ac.uk\/thevoiceoflondon\/category\/news\/\" title=\"News\">News<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tCrossrail delayed until 2021\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/blog.westminster.ac.uk\/thevoiceoflondon"},{"label":"News","link":"https:\/\/blog.westminster.ac.uk\/thevoiceoflondon\/category\/news\/"},{"label":"Crossrail delayed until 2021","link":"https:\/\/blog.westminster.ac.uk\/thevoiceoflondon\/crossrail-delayed-another-year\/"}],"_links":{"self":[{"href":"https:\/\/blog.westminster.ac.uk\/thevoiceoflondon\/wp-json\/wp\/v2\/posts\/32069","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blog.westminster.ac.uk\/thevoiceoflondon\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blog.westminster.ac.uk\/thevoiceoflondon\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blog.westminster.ac.uk\/thevoiceoflondon\/wp-json\/wp\/v2\/users\/476"}],"replies":[{"embeddable":true,"href":"https:\/\/blog.westminster.ac.uk\/thevoiceoflondon\/wp-json\/wp\/v2\/comments?post=32069"}],"version-history":[{"count":0,"href":"https:\/\/blog.westminster.ac.uk\/thevoiceoflondon\/wp-json\/wp\/v2\/posts\/32069\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/blog.westminster.ac.uk\/thevoiceoflondon\/wp-json\/wp\/v2\/media\/32082"}],"wp:attachment":[{"href":"https:\/\/blog.westminster.ac.uk\/thevoiceoflondon\/wp-json\/wp\/v2\/media?parent=32069"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blog.westminster.ac.uk\/thevoiceoflondon\/wp-json\/wp\/v2\/categories?post=32069"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blog.westminster.ac.uk\/thevoiceoflondon\/wp-json\/wp\/v2\/tags?post=32069"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}