Opening times

Term time schedule

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm

Closed for lunch 12pm - 1pm each day

Closed all day Saturday and Sunday and bank holidays

Visit the School

The Project Support Centre is located in the School of Architecture and the Built Environment at the University of Westminster.

Visit the School of Architecture and the Built Environment

A Fast Track Analysis of strategies for infrastructure provision in Great Britain: Technical report

Posted on: 6 July 2012
By:
No Comments »
Filed under: News

Results from the Fast Track Analysis (FTA) from the UK Infrastructure Transitions Research Consortium (ITRC) are available online. The FTA presents the framework for long term strategic analysis of national infrastructure systems, and provides a cross-sectoral overview of infrastructure sectors (energy, transport, water, waste, ICT). It also identifies the high level drivers of change within infrastructure systems, and presents preliminary results from analysis of future demand.

Read more online

Latest posts by mackene (see all)

Leave a Reply

 
 
Accessibility | Cookies | Terms of use and privacy
Social Media
  • В joycasino казино вас ждут захватывающие игры и щедрые бонусы. Регистрация занимает всего пару минут, а зеркало обеспечит удобный вход. Используйте промокоды для максимальных выигрышей. блекспрут зеркало блекспрут зеркало блекспрут ссылкаблекспрут ссылка blacksprut blacksprut