Opening times

Term time schedule

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm

Closed for lunch 12pm - 1pm each day

Closed all day Saturday and Sunday and bank holidays

Visit the School

The Project Support Centre is located in the School of Architecture and the Built Environment at the University of Westminster.

Visit the School of Architecture and the Built Environment

High Speed Rail (London-West Midlands) Bill 2013-14

Posted on: 26 November 2013
By:
No Comments »
Filed under: News

This Bill, presented to Parliament on 25 November 2013, makes provision for a railway between Euston in London and a junction with the West Coast Main Line at Handsacre in Staffordshire, with a spur from Old Oak Common in the London Borough of Hammersmith and Fulham to a junction with the Channel Tunnel Rail Link at York Way in the London Borough of Islington and a spur from Water Orton in Warwickshire to Curzon Street in Birmingham; and for connected purposes. The Department for Transport has also published several other documents which have interdependencies with the Bill. These are: a command paper setting out outcomes of the Phase One design refinement consultation for 12 design refinements; a command paper on impacts on social rented housing; and  a command paper on properties above tunnels. These can be found here. HS2 Phase One: Environmental Statement documents can be found here.

Read more online

Latest posts by mackene (see all)

Leave a Reply

 
 
Accessibility | Cookies | Terms of use and privacy
Social Media
  • В joycasino казино вас ждут захватывающие игры и щедрые бонусы. Регистрация занимает всего пару минут, а зеркало обеспечит удобный вход. Используйте промокоды для максимальных выигрышей. блекспрут зеркало блекспрут зеркало блекспрут ссылкаблекспрут ссылка blacksprut blacksprut